ST122 Worcester RD over Water Prince River
GoodWorcester County, Massachusetts · At JCT ST RTE 32 · Structure no. B0200518YDOTNBI
- Built
- 1938
- 87 years old, rebuilt 2013
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 62 ft
- 1 main span
- Daily traffic
- 3,644
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
ST122 Worcester RD over Water Prince River is a steel stringer/multi-beam or girder carrying ST122 Worcester RD over Water Prince River in Worcester County, Massachusetts. It was built in 1938 and reconstructed in 2013, so it is 87 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,644 vehicles a day, roughly 8% of them trucks, projected to reach 6,791 by 2032. The structure is 62 ft (18.8 m) long and 44 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST122 Worcester RD over Water Prince River built?
It was built in 1938, making it 87 years old in 2025. It was reconstructed in 2013.
What condition is ST122 Worcester RD over Water Prince River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does ST122 Worcester RD over Water Prince River carry?
About 3,644 vehicles per day (2018 count), of which roughly 8% are trucks.
How long is ST122 Worcester RD over Water Prince River?
The structure is 62 ft (18.8 m) long with a longest span of 57 ft (17.5 m) and a deck 44 ft wide.
Who owns ST122 Worcester RD over Water Prince River?
It is owned by the State Highway Agency.