I 90 WB over Comb West ST & Relief
FairWorcester County, Massachusetts · .5 MI N of ST-12 · Structure no. A170414KTDOTNBI
- Built
- 1957
- 68 years old, rebuilt 1986
- Condition
- Fair
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 292 ft
- 5 main spans
- Daily traffic
- 50,958
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I 90 WB over Comb West ST & Relief is a steel stringer/multi-beam or girder carrying I 90 WB over Comb West ST & Relief in Worcester County, Massachusetts. It was built in 1957 and reconstructed in 1986, so it is 68 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50,958 vehicles a day, roughly 18% of them trucks, projected to reach 78,965 by 2032. The structure is 292 ft (89 m) long and 56 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 90 WB over Comb West ST & Relief built?
It was built in 1957, making it 68 years old in 2025. It was reconstructed in 1986.
What condition is I 90 WB over Comb West ST & Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does I 90 WB over Comb West ST & Relief carry?
About 50,958 vehicles per day (2023 count), of which roughly 18% are trucks.
How long is I 90 WB over Comb West ST & Relief?
The structure is 292 ft (89 m) long with a longest span of 66 ft (20.1 m) and a deck 56 ft wide.
Who owns I 90 WB over Comb West ST & Relief?
It is owned by the State Highway Agency.