ST 12 Sobrdge ST over RR Pwrr
FairWorcester County, Massachusetts · .1MI. N. of Auburn St. · Structure no. A1700421EDOT634
- Built
- 1934
- 91 years old, rebuilt 1983
- Condition
- Fair
- inspected May 2022
- Type
- Girder and Floorbeam System
- Steel
- Length
- 129 ft
- 1 main span
- Daily traffic
- 10,298
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
ST 12 Sobrdge ST over RR Pwrr is a steel girder and floorbeam system carrying ST 12 Sobrdge ST over RR Pwrr in Worcester County, Massachusetts. It was built in 1934 and reconstructed in 1983, so it is 91 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10,298 vehicles a day, roughly 11% of them trucks, projected to reach 15,793 by 2031. The structure is 129 ft (39.3 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST 12 Sobrdge ST over RR Pwrr built?
It was built in 1934, making it 91 years old in 2025. It was reconstructed in 1983.
What condition is ST 12 Sobrdge ST over RR Pwrr in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2022.
How much traffic does ST 12 Sobrdge ST over RR Pwrr carry?
About 10,298 vehicles per day (2019 count), of which roughly 11% are trucks.
How long is ST 12 Sobrdge ST over RR Pwrr?
The structure is 129 ft (39.3 m) long with a longest span of 120 ft (36.5 m) and a deck 44 ft wide.
Who owns ST 12 Sobrdge ST over RR Pwrr?
It is owned by the State Highway Agency.