US Bridges

I 93 Hov Ramp EB over Other Relief

Good

Suffolk County, Massachusetts · 0.5 MI S. of I-90 · Structure no. B1666982JDOTNBI

Built
2002
23 years old
Condition
Good
inspected July 2024
Type
Segmental Box Girder
Prestressed Concrete Continuous
Length
229 ft
2 main spans
Daily traffic
2,974
2024 count
Owner
State
State Highway Agency

About this bridge

I 93 Hov Ramp EB over Other Relief is a prestressed concrete continuous segmental box girder carrying I 93 Hov Ramp EB over Other Relief in Suffolk County, Massachusetts. It was built in 2002, so it is 23 years old, younger than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,974 vehicles a day, roughly 4% of them trucks, projected to reach 1,579 by 2031. The structure is 229 ft (69.8 m) long and 25 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesI 93 Hov Ramp EB
CrossesOther Relief
Location0.5 MI S. of I-90
RouteInterstate 93
Coordinates42.3448, -71.06088
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment3: Basically intolerable, requiring high priority of corrective action
Operating rating110.1 US tons
Inventory rating45.9 US tons

Structure

Structure typeSegmental Box Girder
MaterialPrestressed Concrete Continuous
DeckOther
Main spans2
Design loadHS 25 or greater
Structure length229 ft (69.8 m)
Longest span116 ft (35.4 m)
Deck width25 ft (7.5 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,974 (2024)
Projected traffic1,579 by 2031
Trucks4%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of relocation of road
Estimated improvement cost$9.2 million (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 93 Hov Ramp EB over Other Relief built?

It was built in 2002, making it 23 years old in 2025.

What condition is I 93 Hov Ramp EB over Other Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does I 93 Hov Ramp EB over Other Relief carry?

About 2,974 vehicles per day (2024 count), of which roughly 4% are trucks.

How long is I 93 Hov Ramp EB over Other Relief?

The structure is 229 ft (69.8 m) long with a longest span of 116 ft (35.4 m) and a deck 25 ft wide.

Who owns I 93 Hov Ramp EB over Other Relief?

It is owned by the State Highway Agency.