HWY Frnt RD NB over Other Relief
FairSuffolk County, Massachusetts · Just North So by Pass RD · Structure no. B1664791JDOTNBI
- Built
- 2000
- 25 years old
- Condition
- Fair
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 193 ft
- 3 main spans
- Daily traffic
- 42,155
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
HWY Frnt RD NB over Other Relief is a prestressed concrete continuous stringer/multi-beam or girder carrying HWY Frnt RD NB over Other Relief in Suffolk County, Massachusetts. It was built in 2000, so it is 25 years old, younger than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 42,155 vehicles a day, roughly 7% of them trucks, projected to reach 32,060 by 2032. The structure is 193 ft (58.7 m) long and 52 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY Frnt RD NB over Other Relief built?
It was built in 2000, making it 25 years old in 2025.
What condition is HWY Frnt RD NB over Other Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does HWY Frnt RD NB over Other Relief carry?
About 42,155 vehicles per day (2023 count), of which roughly 7% are trucks.
How long is HWY Frnt RD NB over Other Relief?
The structure is 193 ft (58.7 m) long with a longest span of 63 ft (19.3 m) and a deck 52 ft wide.
Who owns HWY Frnt RD NB over Other Relief?
It is owned by the State Highway Agency.