HWY Miner ST over TR Green Line D
FairSuffolk County, Massachusetts · Green Line/Fenway Sta Por · Structure no. B16495AAHMBTNBI
- Built
- 1906
- 119 years old, rebuilt 1977
- Condition
- Fair
- inspected November 2022
- Type
- Channel Beam
- Prestressed Concrete
- Length
- 42 ft
- 1 main span
- Daily traffic
- 1,500
- 2013 count
- Owner
- State
- Other State Agency
About this bridge
HWY Miner ST over TR Green Line D is a prestressed concrete channel beam carrying HWY Miner ST over TR Green Line D in Suffolk County, Massachusetts. It was built in 1906 and reconstructed in 1977, so it is 119 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,500 vehicles a day, projected to reach 18,170 by 2031. The structure is 42 ft (12.8 m) long and 27 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY Miner ST over TR Green Line D built?
It was built in 1906, making it 119 years old in 2025. It was reconstructed in 1977.
What condition is HWY Miner ST over TR Green Line D in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2022.
How much traffic does HWY Miner ST over TR Green Line D carry?
About 1,500 vehicles per day (2013 count).
How long is HWY Miner ST over TR Green Line D?
The structure is 42 ft (12.8 m) long with a longest span of 31 ft (9.4 m) and a deck 27 ft wide.
Who owns HWY Miner ST over TR Green Line D?
It is owned by the Other State Agency and maintained by the State Highway Agency.