US Bridges

ST 3 Cambridge ST over Comb ST3/ST28 & Charles

Fair

Suffolk County, Massachusetts · .2 MI W of Blossom ST · Structure no. B160094F0DOTNBI

Built
1905
120 years old, rebuilt 2018
Condition
Fair
inspected September 2024
Type
Arch - Deck
Steel
Length
2,135 ft
11 main spans
Daily traffic
29,100
2018 count
Owner
State
State Highway Agency

About this bridge

ST 3 Cambridge ST over Comb ST3/ST28 & Charles is a steel arch - deck carrying ST 3 Cambridge ST over Comb ST3/ST28 & Charles in Suffolk County, Massachusetts. It was built in 1905 and reconstructed in 2018, so it is 120 years old, older than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 29,100 vehicles a day, roughly 5% of them trucks, projected to reach 35,692 by 2031. The structure is 2,135 ft (650.7 m) long and 107 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesST 3 Cambridge ST
CrossesComb ST3/ST28 & Charles
Location.2 MI W of Blossom ST
RouteState Highway 3
Coordinates42.36153, -71.07547
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating63.8 US tons
Inventory rating43.4 US tons

Structure

Structure typeArch - Deck
MaterialSteel
DeckConcrete, cast-in-place
Main spans11 (+2 approach)
Design loadUnknown
Structure length2,135 ft (650.7 m)
Longest span243 ft (74.1 m)
Deck width107 ft (32.5 m)
Roadway width91 ft (27.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic29,100 (2018)
Projected traffic35,692 by 2031
Trucks5%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and railroad
CrossesHighway and waterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusListed on the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNavigation control on waterway (bridge permit required)

Frequently asked questions

When was ST 3 Cambridge ST over Comb ST3/ST28 & Charles built?

It was built in 1905, making it 120 years old in 2025. It was reconstructed in 2018.

What condition is ST 3 Cambridge ST over Comb ST3/ST28 & Charles in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does ST 3 Cambridge ST over Comb ST3/ST28 & Charles carry?

About 29,100 vehicles per day (2018 count), of which roughly 5% are trucks.

How long is ST 3 Cambridge ST over Comb ST3/ST28 & Charles?

The structure is 2,135 ft (650.7 m) long with a longest span of 243 ft (74.1 m) and a deck 107 ft wide.

Who owns ST 3 Cambridge ST over Comb ST3/ST28 & Charles?

It is owned by the State Highway Agency.