HWY Pickens ST over ST140 NB
FairPlymouth County, Massachusetts · 1.5 MI SE of Taunton T.L. · Structure no. L010113YPDOTNBI
- Built
- 1958
- 67 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 63 ft
- 1 main span
- Daily traffic
- 2,456
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
HWY Pickens ST over ST140 NB is a steel stringer/multi-beam or girder carrying HWY Pickens ST over ST140 NB in Plymouth County, Massachusetts. It was built in 1958, so it is 67 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,456 vehicles a day, roughly 10% of them trucks, projected to reach 3,474 by 2031. The structure is 63 ft (19.2 m) long and 41 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY Pickens ST over ST140 NB built?
It was built in 1958, making it 67 years old in 2025.
What condition is HWY Pickens ST over ST140 NB in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does HWY Pickens ST over ST140 NB carry?
About 2,456 vehicles per day (2022 count), of which roughly 10% are trucks.
How long is HWY Pickens ST over ST140 NB?
The structure is 63 ft (19.2 m) long with a longest span of 58 ft (17.8 m) and a deck 41 ft wide.
Who owns HWY Pickens ST over ST140 NB?
It is owned by the State Highway Agency.