US Bridges

HWY Bartlett ST over Water Salisbury Brook

Good

Plymouth County, Massachusetts · 100FT N of Wareham Ave · Structure no. B25060AVAMUNNBI

Built
2011
14 years old
Condition
Good
inspected December 2024
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete
Length
35 ft
1 main span
Daily traffic
8,793
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

HWY Bartlett ST over Water Salisbury Brook is a prestressed concrete box beam or girders - single or spread carrying HWY Bartlett ST over Water Salisbury Brook in Plymouth County, Massachusetts. It was built in 2011, so it is 14 years old, younger than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,793 vehicles a day, roughly 6% of them trucks, projected to reach 5,528 by 2031. The structure is 35 ft (10.6 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHWY Bartlett ST
CrossesWater Salisbury Brook
Location100FT N of Wareham Ave
RouteCity Street 0
Coordinates42.07818, -71.02324
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating40.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length35 ft (10.6 m)
Longest span28 ft (8.5 m)
Deck width45 ft (13.6 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,793 (2024)
Projected traffic5,528 by 2031
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$1.1 million (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was HWY Bartlett ST over Water Salisbury Brook built?

It was built in 2011, making it 14 years old in 2025.

What condition is HWY Bartlett ST over Water Salisbury Brook in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does HWY Bartlett ST over Water Salisbury Brook carry?

About 8,793 vehicles per day (2024 count), of which roughly 6% are trucks.

How long is HWY Bartlett ST over Water Salisbury Brook?

The structure is 35 ft (10.6 m) long with a longest span of 28 ft (8.5 m) and a deck 45 ft wide.

Who owns HWY Bartlett ST over Water Salisbury Brook?

It is owned by the City or Municipal Highway Agency.