US Bridges

ST 1 A/Main ST over Water Neponset River

Good

Norfolk County, Massachusetts · Adjacent to North Street · Structure no. W03024BP1DOTNBI

Built
2025
0 years old
Condition
Good
inspected December 2024
Type
Tee Beam
Prestressed Concrete
Length
45 ft
1 main span
Daily traffic
40,862
2024 count
Owner
State
State Highway Agency

About this bridge

ST 1 A/Main ST over Water Neponset River is a prestressed concrete tee beam carrying ST 1 A/Main ST over Water Neponset River in Norfolk County, Massachusetts. It was built in 2025, so it is 0 years old, younger than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 40,862 vehicles a day, roughly 3% of them trucks. The structure is 45 ft (13.8 m) long and 59 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesST 1 A/Main ST
CrossesWater Neponset River
LocationAdjacent to North Street
RouteState Highway 1A
Coordinates42.15314, -71.24739
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length45 ft (13.8 m)
Longest span42 ft (12.8 m)
Deck width59 ft (17.9 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic40,862 (2024)
Projected traffic—
Trucks3%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was ST 1 A/Main ST over Water Neponset River built?

It was built in 2025, making it 0 years old in 2025.

What condition is ST 1 A/Main ST over Water Neponset River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does ST 1 A/Main ST over Water Neponset River carry?

About 40,862 vehicles per day (2024 count), of which roughly 3% are trucks.

How long is ST 1 A/Main ST over Water Neponset River?

The structure is 45 ft (13.8 m) long with a longest span of 42 ft (12.8 m) and a deck 59 ft wide.

Who owns ST 1 A/Main ST over Water Neponset River?

It is owned by the State Highway Agency.