US Bridges

HWY Provdnce HWY over ST135 High & Harris Sts

Good

Norfolk County, Massachusetts · Providence HWY & Wash. ST · Structure no. D05029AGUDOTNBI

Built
2010
15 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
355 ft
3 main spans
Daily traffic
50,700
2023 count
Owner
State
State Highway Agency

About this bridge

HWY Provdnce HWY over ST135 High & Harris Sts is a prestressed concrete continuous stringer/multi-beam or girder carrying HWY Provdnce HWY over ST135 High & Harris Sts in Norfolk County, Massachusetts. It was built in 2010, so it is 15 years old, younger than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50,700 vehicles a day, roughly 7% of them trucks, projected to reach 85,914 by 2032. The structure is 355 ft (108.2 m) long and 84 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesHWY Provdnce HWY
CrossesST135 High & Harris Sts
LocationProvidence HWY & Wash. ST
RouteU.S. Route 0
Coordinates42.24874, -71.17108
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment6: Equal to present minimum criteria
Operating rating85.8 US tons
Inventory rating50 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length355 ft (108.2 m)
Longest span123 ft (37.5 m)
Deck width84 ft (25.7 m)
Roadway width72 ft (21.9 m)
Vertical clearance over deck0 ft (0 m)

Traffic and service

Average daily traffic50,700 (2023)
Projected traffic85,914 by 2032
Trucks7%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$45.4 million (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was HWY Provdnce HWY over ST135 High & Harris Sts built?

It was built in 2010, making it 15 years old in 2025.

What condition is HWY Provdnce HWY over ST135 High & Harris Sts in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does HWY Provdnce HWY over ST135 High & Harris Sts carry?

About 50,700 vehicles per day (2023 count), of which roughly 7% are trucks.

How long is HWY Provdnce HWY over ST135 High & Harris Sts?

The structure is 355 ft (108.2 m) long with a longest span of 123 ft (37.5 m) and a deck 84 ft wide.

Who owns HWY Provdnce HWY over ST135 High & Harris Sts?

It is owned by the State Highway Agency.