HWY Montvale Ave over Water Aberjona River
FairMiddlesex County, Massachusetts · 0.2 MI W RTE 93 · Structure no. W430412KHDOTNBI
- Built
- 1958
- 67 years old
- Condition
- Fair
- inspected March 2025
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 28 ft
- 1 main span
- Daily traffic
- 39,100
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
HWY Montvale Ave over Water Aberjona River is a prestressed concrete box beam or girders - multiple carrying HWY Montvale Ave over Water Aberjona River in Middlesex County, Massachusetts. It was built in 1958, so it is 67 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 39,100 vehicles a day, roughly 5% of them trucks, projected to reach 65,857 by 2032. The structure is 28 ft (8.5 m) long and 78 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY Montvale Ave over Water Aberjona River built?
It was built in 1958, making it 67 years old in 2025.
What condition is HWY Montvale Ave over Water Aberjona River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2025.
How much traffic does HWY Montvale Ave over Water Aberjona River carry?
About 39,100 vehicles per day (2019 count), of which roughly 5% are trucks.
How long is HWY Montvale Ave over Water Aberjona River?
The structure is 28 ft (8.5 m) long with a longest span of 26 ft (7.9 m) and a deck 78 ft wide.
Who owns HWY Montvale Ave over Water Aberjona River?
It is owned by the State Highway Agency.