HWY Prospect ST over RR Mbta/Bmrr
FairMiddlesex County, Massachusetts · 1.5 MI N of Harvard Br. · Structure no. S170203GBDOT634
- Built
- 1933
- 92 years old, rebuilt 1984
- Condition
- Fair
- inspected January 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 40 ft
- 1 main span
- Daily traffic
- 14,900
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
HWY Prospect ST over RR Mbta/Bmrr is a prestressed concrete box beam or girders - multiple carrying HWY Prospect ST over RR Mbta/Bmrr in Middlesex County, Massachusetts. It was built in 1933 and reconstructed in 1984, so it is 92 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 14,900 vehicles a day, roughly 11% of them trucks, projected to reach 32,534 by 2033. The structure is 40 ft (12.2 m) long and 49 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY Prospect ST over RR Mbta/Bmrr built?
It was built in 1933, making it 92 years old in 2025. It was reconstructed in 1984.
What condition is HWY Prospect ST over RR Mbta/Bmrr in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does HWY Prospect ST over RR Mbta/Bmrr carry?
About 14,900 vehicles per day (2018 count), of which roughly 11% are trucks.
How long is HWY Prospect ST over RR Mbta/Bmrr?
The structure is 40 ft (12.2 m) long with a longest span of 39 ft (11.9 m) and a deck 49 ft wide.
Who owns HWY Prospect ST over RR Mbta/Bmrr?
It is owned by the State Highway Agency.