HWY Langley RD over TR Green Line D
FairMiddlesex County, Massachusetts · Over Green Line · Structure no. N120334TVMBTNBI
- Built
- 1907
- 118 years old, rebuilt 2008
- Condition
- Fair
- inspected September 2021
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 51 ft
- 1 main span
- Daily traffic
- 3,000
- 1997 count
- Owner
- State
- Other State Agency
About this bridge
HWY Langley RD over TR Green Line D is a prestressed concrete box beam or girders - multiple carrying HWY Langley RD over TR Green Line D in Middlesex County, Massachusetts. It was built in 1907 and reconstructed in 2008, so it is 118 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,000 vehicles a day, roughly 8% of them trucks, projected to reach 4,738 by 2030. The structure is 51 ft (15.5 m) long and 60 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY Langley RD over TR Green Line D built?
It was built in 1907, making it 118 years old in 2025. It was reconstructed in 2008.
What condition is HWY Langley RD over TR Green Line D in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2021.
How much traffic does HWY Langley RD over TR Green Line D carry?
About 3,000 vehicles per day (1997 count), of which roughly 8% are trucks.
How long is HWY Langley RD over TR Green Line D?
The structure is 51 ft (15.5 m) long with a longest span of 43 ft (13.2 m) and a deck 60 ft wide.
Who owns HWY Langley RD over TR Green Line D?
It is owned by the Other State Agency.