ST 30 WB Servce RD over Comb I 90 & Csx/Mbta
FairMiddlesex County, Massachusetts · .4 MI W. Int 16 S14 B · Structure no. N120294QTDOTNBI
- Built
- 1964
- 61 years old
- Condition
- Fair
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 187 ft
- 3 main spans
- Daily traffic
- 100
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
ST 30 WB Servce RD over Comb I 90 & Csx/Mbta is a steel stringer/multi-beam or girder carrying ST 30 WB Servce RD over Comb I 90 & Csx/Mbta in Middlesex County, Massachusetts. It was built in 1964, so it is 61 years old, younger than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 100 vehicles a day, roughly 1% of them trucks, projected to reach 1,106 by 2031. The structure is 187 ft (57 m) long and 50 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST 30 WB Servce RD over Comb I 90 & Csx/Mbta built?
It was built in 1964, making it 61 years old in 2025.
What condition is ST 30 WB Servce RD over Comb I 90 & Csx/Mbta in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does ST 30 WB Servce RD over Comb I 90 & Csx/Mbta carry?
About 100 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is ST 30 WB Servce RD over Comb I 90 & Csx/Mbta?
The structure is 187 ft (57 m) long with a longest span of 67 ft (20.3 m) and a deck 50 ft wide.
Who owns ST 30 WB Servce RD over Comb I 90 & Csx/Mbta?
It is owned by the State Highway Agency.