HWY Fruit ST over Comb Mbta/Csx & Sudbury
GoodMiddlesex County, Massachusetts · .7 MI East of I - 495 · Structure no. H23006BUXDOT634
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 190 ft
- 3 main spans
- Daily traffic
- 2,600
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
HWY Fruit ST over Comb Mbta/Csx & Sudbury is a steel continuous stringer/multi-beam or girder carrying HWY Fruit ST over Comb Mbta/Csx & Sudbury in Middlesex County, Massachusetts. It was built in 2023, so it is 2 years old, younger than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,600 vehicles a day, roughly 11% of them trucks. The structure is 190 ft (57.8 m) long and 40 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY Fruit ST over Comb Mbta/Csx & Sudbury built?
It was built in 2023, making it 2 years old in 2025.
What condition is HWY Fruit ST over Comb Mbta/Csx & Sudbury in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does HWY Fruit ST over Comb Mbta/Csx & Sudbury carry?
About 2,600 vehicles per day (2024 count), of which roughly 11% are trucks.
How long is HWY Fruit ST over Comb Mbta/Csx & Sudbury?
The structure is 190 ft (57.8 m) long with a longest span of 90 ft (27.4 m) and a deck 40 ft wide.
Who owns HWY Fruit ST over Comb Mbta/Csx & Sudbury?
It is owned by the State Highway Agency.