ST129 Billerica RD over US 3
FairMiddlesex County, Massachusetts · Rt 129 at Rt 3 · Structure no. C08024AY7DOTNBI
- Built
- 2004
- 21 years old
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 285 ft
- 2 main spans
- Daily traffic
- 25,000
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
ST129 Billerica RD over US 3 is a steel continuous stringer/multi-beam or girder carrying ST129 Billerica RD over US 3 in Middlesex County, Massachusetts. It was built in 2004, so it is 21 years old, younger than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 25,000 vehicles a day, roughly 6% of them trucks, projected to reach 38,693 by 2032. The structure is 285 ft (87 m) long and 74 ft wide. If it were closed, the detour would be 7.5 mi (12 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST129 Billerica RD over US 3 built?
It was built in 2004, making it 21 years old in 2025.
What condition is ST129 Billerica RD over US 3 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does ST129 Billerica RD over US 3 carry?
About 25,000 vehicles per day (2019 count), of which roughly 6% are trucks.
How long is ST129 Billerica RD over US 3?
The structure is 285 ft (87 m) long with a longest span of 139 ft (42.5 m) and a deck 74 ft wide.
Who owns ST129 Billerica RD over US 3?
It is owned by the State Highway Agency.