US Bridges

I 95 NB/ST128 NB over ST 3 A/Cambridge ST

Fair

Middlesex County, Massachusetts · At Junc. of I 95 & ST 3A · Structure no. B290102EUDOTNBI

Built
1950
75 years old, rebuilt 1964
Condition
Fair
inspected August 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
205 ft
3 main spans
Daily traffic
89,900
2019 count
Owner
State
State Highway Agency

About this bridge

I 95 NB/ST128 NB over ST 3 A/Cambridge ST is a steel stringer/multi-beam or girder carrying I 95 NB/ST128 NB over ST 3 A/Cambridge ST in Middlesex County, Massachusetts. It was built in 1950 and reconstructed in 1964, so it is 75 years old, older than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 89,900 vehicles a day, roughly 10% of them trucks, projected to reach 252,530 by 2032. The structure is 205 ft (62.5 m) long and 74 ft wide. If it were closed, the detour would be 4.3 mi (7 km).

CarriesI 95 NB/ST128 NB
CrossesST 3 A/Cambridge ST
LocationAt Junc. of I 95 & ST 3A
RouteInterstate 128
Coordinates42.48854, -71.19153
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47 US tons
Inventory rating28.1 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadH 20
Structure length205 ft (62.5 m)
Longest span105 ft (32 m)
Deck width74 ft (22.6 m)
Roadway width60 ft (18.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic89,900 (2019)
Projected traffic252,530 by 2032
Trucks10%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed4.3 mi (7 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$13.9 million (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 95 NB/ST128 NB over ST 3 A/Cambridge ST built?

It was built in 1950, making it 75 years old in 2025. It was reconstructed in 1964.

What condition is I 95 NB/ST128 NB over ST 3 A/Cambridge ST in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does I 95 NB/ST128 NB over ST 3 A/Cambridge ST carry?

About 89,900 vehicles per day (2019 count), of which roughly 10% are trucks.

How long is I 95 NB/ST128 NB over ST 3 A/Cambridge ST?

The structure is 205 ft (62.5 m) long with a longest span of 105 ft (32 m) and a deck 74 ft wide.

Who owns I 95 NB/ST128 NB over ST 3 A/Cambridge ST?

It is owned by the State Highway Agency.