HWY Fountain ST over RR Mbta/Csx
GoodMiddlesex County, Massachusetts · .1 Mi. N. of ST-135 · Structure no. A14011AE1DOT634
- Built
- 2001
- 24 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 122 ft
- 3 main spans
- Daily traffic
- 4,500
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
HWY Fountain ST over RR Mbta/Csx is a steel continuous stringer/multi-beam or girder carrying HWY Fountain ST over RR Mbta/Csx in Middlesex County, Massachusetts. It was built in 2001, so it is 24 years old, younger than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,500 vehicles a day, roughly 2% of them trucks, projected to reach 8,418 by 2032. The structure is 122 ft (37.2 m) long and 35 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY Fountain ST over RR Mbta/Csx built?
It was built in 2001, making it 24 years old in 2025.
What condition is HWY Fountain ST over RR Mbta/Csx in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does HWY Fountain ST over RR Mbta/Csx carry?
About 4,500 vehicles per day (2023 count), of which roughly 2% are trucks.
How long is HWY Fountain ST over RR Mbta/Csx?
The structure is 122 ft (37.2 m) long with a longest span of 55 ft (16.8 m) and a deck 35 ft wide.
Who owns HWY Fountain ST over RR Mbta/Csx?
It is owned by the State Highway Agency.