HWY Drake RD over Other Minuteman Bike Pth
FairMiddlesex County, Massachusetts · 0.4 MI W of Park Ave · Structure no. A100197XJMUNNBI
- Built
- 1995
- 30 years old
- Condition
- Fair
- inspected January 2025
- Type
- Slab
- Prestressed Concrete
- Length
- 26 ft
- 1 main span
- Daily traffic
- 450
- 2025 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
HWY Drake RD over Other Minuteman Bike Pth is a prestressed concrete slab carrying HWY Drake RD over Other Minuteman Bike Pth in Middlesex County, Massachusetts. It was built in 1995, so it is 30 years old, younger than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 450 vehicles a day, roughly 5% of them trucks, projected to reach 790 by 2013. The structure is 26 ft (7.9 m) long and 35 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY Drake RD over Other Minuteman Bike Pth built?
It was built in 1995, making it 30 years old in 2025.
What condition is HWY Drake RD over Other Minuteman Bike Pth in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does HWY Drake RD over Other Minuteman Bike Pth carry?
About 450 vehicles per day (2025 count), of which roughly 5% are trucks.
How long is HWY Drake RD over Other Minuteman Bike Pth?
The structure is 26 ft (7.9 m) long with a longest span of 26 ft (7.9 m) and a deck 35 ft wide.
Who owns HWY Drake RD over Other Minuteman Bike Pth?
It is owned by the Town or Township Highway Agency.