I 90 EB over ST 32 Thorndike ST
FairHampden County, Massachusetts · Mm 63.3 on I-90 EB · Structure no. P010524MDDOTNBI
- Built
- 1957
- 68 years old, rebuilt 1984
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 197 ft
- 3 main spans
- Daily traffic
- 23,956
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
I 90 EB over ST 32 Thorndike ST is a steel stringer/multi-beam or girder carrying I 90 EB over ST 32 Thorndike ST in Hampden County, Massachusetts. It was built in 1957 and reconstructed in 1984, so it is 68 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 23,956 vehicles a day, roughly 15% of them trucks, projected to reach 53,745 by 2032. The structure is 197 ft (60 m) long and 46 ft wide. If it were closed, the detour would be 14.9 mi (24 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 90 EB over ST 32 Thorndike ST built?
It was built in 1957, making it 68 years old in 2025. It was reconstructed in 1984.
What condition is I 90 EB over ST 32 Thorndike ST in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does I 90 EB over ST 32 Thorndike ST carry?
About 23,956 vehicles per day (2017 count), of which roughly 15% are trucks.
How long is I 90 EB over ST 32 Thorndike ST?
The structure is 197 ft (60 m) long with a longest span of 71 ft (21.5 m) and a deck 46 ft wide.
Who owns I 90 EB over ST 32 Thorndike ST?
It is owned by the State Highway Agency.