ST 32 Main ST over RR Necrr
FairHampden County, Massachusetts · 0.1 M S JCT of High ST · Structure no. M270241ALDOT634
- Built
- 1920
- 105 years old, rebuilt 1975
- Condition
- Fair
- inspected February 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 23 ft
- 1 main span
- Daily traffic
- 13,500
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
ST 32 Main ST over RR Necrr is a prestressed concrete slab carrying ST 32 Main ST over RR Necrr in Hampden County, Massachusetts. It was built in 1920 and reconstructed in 1975, so it is 105 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 13,500 vehicles a day, roughly 6% of them trucks, projected to reach 12,661 by 2033. The structure is 23 ft (7 m) long and 54 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST 32 Main ST over RR Necrr built?
It was built in 1920, making it 105 years old in 2025. It was reconstructed in 1975.
What condition is ST 32 Main ST over RR Necrr in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does ST 32 Main ST over RR Necrr carry?
About 13,500 vehicles per day (2024 count), of which roughly 6% are trucks.
How long is ST 32 Main ST over RR Necrr?
The structure is 23 ft (7 m) long with a longest span of 23 ft (6.9 m) and a deck 54 ft wide.
Who owns ST 32 Main ST over RR Necrr?
It is owned by the State Highway Agency.