US Bridges

HWY Hovey RD over RR CSX

Good

Hampden County, Massachusetts · 300 S of Rt 20 · Structure no. M27012ALRDOT634

Built
2002
23 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
117 ft
2 main spans
Daily traffic
1,600
2018 count
Owner
State
State Highway Agency

About this bridge

HWY Hovey RD over RR CSX is a steel continuous stringer/multi-beam or girder carrying HWY Hovey RD over RR CSX in Hampden County, Massachusetts. It was built in 2002, so it is 23 years old, younger than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,600 vehicles a day, roughly 11% of them trucks, projected to reach 316 by 2031. The structure is 117 ft (35.8 m) long and 40 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesHWY Hovey RD
CrossesRR CSX
Location300 S of Rt 20
RouteCity Street 0
Coordinates42.15861, -72.35781
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating82.9 US tons
Inventory rating49.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length117 ft (35.8 m)
Longest span57 ft (17.3 m)
Deck width40 ft (12.1 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,600 (2018)
Projected traffic316 by 2031
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$3 million (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was HWY Hovey RD over RR CSX built?

It was built in 2002, making it 23 years old in 2025.

What condition is HWY Hovey RD over RR CSX in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does HWY Hovey RD over RR CSX carry?

About 1,600 vehicles per day (2018 count), of which roughly 11% are trucks.

How long is HWY Hovey RD over RR CSX?

The structure is 117 ft (35.8 m) long with a longest span of 57 ft (17.3 m) and a deck 40 ft wide.

Who owns HWY Hovey RD over RR CSX?

It is owned by the State Highway Agency.