HWY Jackson ST over Water Second Level Canal
FairHampden County, Massachusetts · .3 MI NW of 3rd Canal · Structure no. H21011AH9MUNNBI
- Built
- 1996
- 29 years old
- Condition
- Fair
- inspected September 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 114 ft
- 2 main spans
- Daily traffic
- 4,559
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
HWY Jackson ST over Water Second Level Canal is a prestressed concrete box beam or girders - single or spread carrying HWY Jackson ST over Water Second Level Canal in Hampden County, Massachusetts. It was built in 1996, so it is 29 years old, younger than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,559 vehicles a day, roughly 5% of them trucks, projected to reach 4,436 by 2031. The structure is 114 ft (34.7 m) long and 60 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY Jackson ST over Water Second Level Canal built?
It was built in 1996, making it 29 years old in 2025.
What condition is HWY Jackson ST over Water Second Level Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does HWY Jackson ST over Water Second Level Canal carry?
About 4,559 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is HWY Jackson ST over Water Second Level Canal?
The structure is 114 ft (34.7 m) long with a longest span of 54 ft (16.4 m) and a deck 60 ft wide.
Who owns HWY Jackson ST over Water Second Level Canal?
It is owned by the City or Municipal Highway Agency.