I 291 over HWY Fuller RD
FairHampden County, Massachusetts · Mm 5.2 on I-291 · Structure no. C130304HRDOTNBI
- Built
- 1957
- 68 years old, rebuilt 1995
- Condition
- Fair
- inspected February 2025
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 61 ft
- 1 main span
- Daily traffic
- 46,423
- 2007 count
- Owner
- State
- State Highway Agency
About this bridge
I 291 over HWY Fuller RD is a steel stringer/multi-beam or girder carrying I 291 over HWY Fuller RD in Hampden County, Massachusetts. It was built in 1957 and reconstructed in 1995, so it is 68 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 46,423 vehicles a day, roughly 10% of them trucks, projected to reach 73,316 by 2032. The structure is 61 ft (18.6 m) long and 96 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 291 over HWY Fuller RD built?
It was built in 1957, making it 68 years old in 2025. It was reconstructed in 1995.
What condition is I 291 over HWY Fuller RD in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.
How much traffic does I 291 over HWY Fuller RD carry?
About 46,423 vehicles per day (2007 count), of which roughly 10% are trucks.
How long is I 291 over HWY Fuller RD?
The structure is 61 ft (18.6 m) long with a longest span of 55 ft (16.8 m) and a deck 96 ft wide.
Who owns I 291 over HWY Fuller RD?
It is owned by the State Highway Agency.