HWY Willmsbrg RD over Water West Brook Spilway
GoodFranklin County, Massachusetts · South End Nhamp Resvoir · Structure no. W330120TRMUNNBI
- Built
- 1993
- 32 years old
- Condition
- Good
- inspected January 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 61 ft
- 1 main span
- Daily traffic
- 260
- 2018 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
HWY Willmsbrg RD over Water West Brook Spilway is a prestressed concrete box beam or girders - multiple carrying HWY Willmsbrg RD over Water West Brook Spilway in Franklin County, Massachusetts. It was built in 1993, so it is 32 years old, younger than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 260 vehicles a day, projected to reach 411 by 2033. The structure is 61 ft (18.6 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY Willmsbrg RD over Water West Brook Spilway built?
It was built in 1993, making it 32 years old in 2025.
What condition is HWY Willmsbrg RD over Water West Brook Spilway in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does HWY Willmsbrg RD over Water West Brook Spilway carry?
About 260 vehicles per day (2018 count).
How long is HWY Willmsbrg RD over Water West Brook Spilway?
The structure is 61 ft (18.6 m) long with a longest span of 58 ft (17.8 m) and a deck 28 ft wide.
Who owns HWY Willmsbrg RD over Water West Brook Spilway?
It is owned by the Town or Township Highway Agency.