HWY Reil Lane over Water E Br North River
GoodFranklin County, Massachusetts · @ Route 112 Intersection · Structure no. C180260GQMUNNBI
- Built
- 1988
- 37 years old
- Condition
- Good
- inspected December 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 78 ft
- 1 main span
- Daily traffic
- 129
- 2024 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
HWY Reil Lane over Water E Br North River is a prestressed concrete box beam or girders - multiple carrying HWY Reil Lane over Water E Br North River in Franklin County, Massachusetts. It was built in 1988, so it is 37 years old, younger than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 129 vehicles a day, roughly 1% of them trucks, projected to reach 158 by 2031. The structure is 78 ft (23.7 m) long and 17 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY Reil Lane over Water E Br North River built?
It was built in 1988, making it 37 years old in 2025.
What condition is HWY Reil Lane over Water E Br North River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does HWY Reil Lane over Water E Br North River carry?
About 129 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is HWY Reil Lane over Water E Br North River?
The structure is 78 ft (23.7 m) long with a longest span of 77 ft (23.5 m) and a deck 17 ft wide.
Who owns HWY Reil Lane over Water E Br North River?
It is owned by the Town or Township Highway Agency.