ST112 Main RD over Water Johnson Brook
FairFranklin County, Massachusetts · .9 MI N. of Charlemont RD · Structure no. C180110KMDOTNBI
- Built
- 1929
- 96 years old
- Condition
- Fair
- inspected December 2024
- Type
- Tee Beam
- Concrete
- Length
- 25 ft
- 1 main span
- Daily traffic
- 1,810
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
ST112 Main RD over Water Johnson Brook is a concrete tee beam carrying ST112 Main RD over Water Johnson Brook in Franklin County, Massachusetts. It was built in 1929, so it is 96 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,810 vehicles a day, roughly 13% of them trucks, projected to reach 2,527 by 2031. The structure is 25 ft (7.6 m) long and 31 ft wide. If it were closed, the detour would be 16.8 mi (27 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST112 Main RD over Water Johnson Brook built?
It was built in 1929, making it 96 years old in 2025.
What condition is ST112 Main RD over Water Johnson Brook in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does ST112 Main RD over Water Johnson Brook carry?
About 1,810 vehicles per day (2016 count), of which roughly 13% are trucks.
How long is ST112 Main RD over Water Johnson Brook?
The structure is 25 ft (7.6 m) long with a longest span of 20 ft (6.1 m) and a deck 31 ft wide.
Who owns ST112 Main RD over Water Johnson Brook?
It is owned by the State Highway Agency.