HWY Flint ST over Water North River Canal
FairEssex County, Massachusetts · .4 MI Sw. of RT114 · Structure no. S01021AV1MUNNBI
- Built
- 1998
- 27 years old
- Condition
- Fair
- inspected July 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 45 ft
- 1 main span
- Daily traffic
- 12,801
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
HWY Flint ST over Water North River Canal is a prestressed concrete box beam or girders - multiple carrying HWY Flint ST over Water North River Canal in Essex County, Massachusetts. It was built in 1998, so it is 27 years old, younger than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 12,801 vehicles a day, roughly 10% of them trucks, projected to reach 12,476 by 2031. The structure is 45 ft (13.8 m) long and 121 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY Flint ST over Water North River Canal built?
It was built in 1998, making it 27 years old in 2025.
What condition is HWY Flint ST over Water North River Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does HWY Flint ST over Water North River Canal carry?
About 12,801 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is HWY Flint ST over Water North River Canal?
The structure is 45 ft (13.8 m) long with a longest span of 45 ft (13.8 m) and a deck 121 ft wide.
Who owns HWY Flint ST over Water North River Canal?
It is owned by the City or Municipal Highway Agency.