US Bridges

HWY Endicott ST over Water Proctor Brook

Good

Essex County, Massachusetts · 500 N of Lowell ST · Structure no. P03014C94MUNNBI

Built
2023
2 years old
Condition
Good
inspected February 2024
Type
Slab
Prestressed Concrete
Length
31 ft
1 main span
Daily traffic
5,600
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

HWY Endicott ST over Water Proctor Brook is a prestressed concrete slab carrying HWY Endicott ST over Water Proctor Brook in Essex County, Massachusetts. It was built in 2023, so it is 2 years old, younger than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,600 vehicles a day, roughly 4% of them trucks. The structure is 31 ft (9.4 m) long and 47 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesHWY Endicott ST
CrossesWater Proctor Brook
Location500 N of Lowell ST
RouteCity Street 0
Coordinates42.5308, -70.93401
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length31 ft (9.4 m)
Longest span26 ft (7.9 m)
Deck width47 ft (14.3 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,600 (2020)
Projected traffic—
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was HWY Endicott ST over Water Proctor Brook built?

It was built in 2023, making it 2 years old in 2025.

What condition is HWY Endicott ST over Water Proctor Brook in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does HWY Endicott ST over Water Proctor Brook carry?

About 5,600 vehicles per day (2020 count), of which roughly 4% are trucks.

How long is HWY Endicott ST over Water Proctor Brook?

The structure is 31 ft (9.4 m) long with a longest span of 26 ft (7.9 m) and a deck 47 ft wide.

Who owns HWY Endicott ST over Water Proctor Brook?

It is owned by the City or Municipal Highway Agency.