ST 1 A/Cabot ST over Water Danvers River
FairEssex County, Massachusetts · At Danvers River · Structure no. B110042TNDOTNBI
- Built
- 1996
- 29 years old
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 2,233 ft
- 14 main spans
- Daily traffic
- 48,600
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
ST 1 A/Cabot ST over Water Danvers River is a steel continuous stringer/multi-beam or girder carrying ST 1 A/Cabot ST over Water Danvers River in Essex County, Massachusetts. It was built in 1996, so it is 29 years old, younger than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 48,600 vehicles a day, roughly 4% of them trucks, projected to reach 50,538 by 2032. The structure is 2,233 ft (680.6 m) long and 89 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST 1 A/Cabot ST over Water Danvers River built?
It was built in 1996, making it 29 years old in 2025.
What condition is ST 1 A/Cabot ST over Water Danvers River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does ST 1 A/Cabot ST over Water Danvers River carry?
About 48,600 vehicles per day (2023 count), of which roughly 4% are trucks.
How long is ST 1 A/Cabot ST over Water Danvers River?
The structure is 2,233 ft (680.6 m) long with a longest span of 220 ft (67.1 m) and a deck 89 ft wide.
Who owns ST 1 A/Cabot ST over Water Danvers River?
It is owned by the State Highway Agency.