US Bridges

HWY Holloway ST over ST140 SB

Good

Bristol County, Massachusetts · .9 MI NW of Lakeville T.L · Structure no. T010573YDDOTNBI

Built
1970
55 years old, rebuilt 2012
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
95 ft
1 main span
Daily traffic
1,143
2024 count
Owner
State
State Highway Agency

About this bridge

HWY Holloway ST over ST140 SB is a steel stringer/multi-beam or girder carrying HWY Holloway ST over ST140 SB in Bristol County, Massachusetts. It was built in 1970 and reconstructed in 2012, so it is 55 years old, younger than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,143 vehicles a day, roughly 6% of them trucks, projected to reach 2,527 by 2032. The structure is 95 ft (29 m) long and 41 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesHWY Holloway ST
CrossesST140 SB
Location.9 MI NW of Lakeville T.L
RouteCity Street 0
Coordinates41.84753, -71.01937
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72 US tons
Inventory rating43.1 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadH 20
Structure length95 ft (29 m)
Longest span90 ft (27.3 m)
Deck width41 ft (12.6 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,143 (2024)
Projected traffic2,527 by 2032
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$2.5 million (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was HWY Holloway ST over ST140 SB built?

It was built in 1970, making it 55 years old in 2025. It was reconstructed in 2012.

What condition is HWY Holloway ST over ST140 SB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does HWY Holloway ST over ST140 SB carry?

About 1,143 vehicles per day (2024 count), of which roughly 6% are trucks.

How long is HWY Holloway ST over ST140 SB?

The structure is 95 ft (29 m) long with a longest span of 90 ft (27.3 m) and a deck 41 ft wide.

Who owns HWY Holloway ST over ST140 SB?

It is owned by the State Highway Agency.