ST123 E Main ST over Water Rumford River
FairBristol County, Massachusetts · .8 MI NE of ST 140 · Structure no. N230143V0DOTNBI
- Built
- 1958
- 67 years old
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 50 ft
- 1 main span
- Daily traffic
- 10,786
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
ST123 E Main ST over Water Rumford River is a steel stringer/multi-beam or girder carrying ST123 E Main ST over Water Rumford River in Bristol County, Massachusetts. It was built in 1958, so it is 67 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10,786 vehicles a day, roughly 13% of them trucks, projected to reach 31,586 by 2031. The structure is 50 ft (15.2 m) long and 53 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST123 E Main ST over Water Rumford River built?
It was built in 1958, making it 67 years old in 2025.
What condition is ST123 E Main ST over Water Rumford River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does ST123 E Main ST over Water Rumford River carry?
About 10,786 vehicles per day (2024 count), of which roughly 13% are trucks.
How long is ST123 E Main ST over Water Rumford River?
The structure is 50 ft (15.2 m) long with a longest span of 47 ft (14.3 m) and a deck 53 ft wide.
Who owns ST123 E Main ST over Water Rumford River?
It is owned by the State Highway Agency.