ST 1 A/Newprt Av over Comb RR Amtrak/Mbta RD
GoodBristol County, Massachusetts · .2 MI So I 95 Interchange · Structure no. A16032B59DOT634
- Built
- 2011
- 14 years old
- Condition
- Good
- inspected October 2022
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 93 ft
- 1 main span
- Daily traffic
- 34,933
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
ST 1 A/Newprt Av over Comb RR Amtrak/Mbta RD is a steel stringer/multi-beam or girder carrying ST 1 A/Newprt Av over Comb RR Amtrak/Mbta RD in Bristol County, Massachusetts. It was built in 2011, so it is 14 years old, younger than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 34,933 vehicles a day, roughly 6% of them trucks, projected to reach 51,643 by 2032. The structure is 93 ft (28.4 m) long and 72 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST 1 A/Newprt Av over Comb RR Amtrak/Mbta RD built?
It was built in 2011, making it 14 years old in 2025.
What condition is ST 1 A/Newprt Av over Comb RR Amtrak/Mbta RD in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2022.
How much traffic does ST 1 A/Newprt Av over Comb RR Amtrak/Mbta RD carry?
About 34,933 vehicles per day (2021 count), of which roughly 6% are trucks.
How long is ST 1 A/Newprt Av over Comb RR Amtrak/Mbta RD?
The structure is 93 ft (28.4 m) long with a longest span of 90 ft (27.4 m) and a deck 72 ft wide.
Who owns ST 1 A/Newprt Av over Comb RR Amtrak/Mbta RD?
It is owned by the State Highway Agency.