US Bridges

ST152 N Main ST over Water Bungay River

Good

Bristol County, Massachusetts · @ Colonal Blakington Inn · Structure no. A16018945MUNNBI

Built
2012
13 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
33 ft
1 main span
Daily traffic
21,983
2024 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

ST152 N Main ST over Water Bungay River is a steel stringer/multi-beam or girder carrying ST152 N Main ST over Water Bungay River in Bristol County, Massachusetts. It was built in 2012, so it is 13 years old, younger than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 21,983 vehicles a day, roughly 4% of them trucks, projected to reach 28,427 by 2005. The structure is 33 ft (10 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesST152 N Main ST
CrossesWater Bungay River
Location@ Colonal Blakington Inn
RouteCity Street 152
Coordinates41.94996, -71.29004
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating110.1 US tons
Inventory rating70.4 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length33 ft (10 m)
Longest span32 ft (9.9 m)
Deck width48 ft (14.7 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic21,983 (2024)
Projected traffic28,427 by 2005
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$712,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was ST152 N Main ST over Water Bungay River built?

It was built in 2012, making it 13 years old in 2025.

What condition is ST152 N Main ST over Water Bungay River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does ST152 N Main ST over Water Bungay River carry?

About 21,983 vehicles per day (2024 count), of which roughly 4% are trucks.

How long is ST152 N Main ST over Water Bungay River?

The structure is 33 ft (10 m) long with a longest span of 32 ft (9.9 m) and a deck 48 ft wide.

Who owns ST152 N Main ST over Water Bungay River?

It is owned by the Town or Township Highway Agency.