ST 2 Main ST over Water Green River
GoodBerkshire County, Massachusetts · .1 MI East of Cole Ave · Structure no. W37015C4RDOTNBI
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected February 2024
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 129 ft
- 2 main spans
- Daily traffic
- 12,280
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
ST 2 Main ST over Water Green River is a prestressed concrete tee beam carrying ST 2 Main ST over Water Green River in Berkshire County, Massachusetts. It was built in 2024, so it is 1 years old, younger than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: open, would be posted or closed except for temporary shoring.
It carries about 12,280 vehicles a day, roughly 4% of them trucks. The structure is 129 ft (39.2 m) long and 26 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST 2 Main ST over Water Green River built?
It was built in 2024, making it 1 years old in 2025.
What condition is ST 2 Main ST over Water Green River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does ST 2 Main ST over Water Green River carry?
About 12,280 vehicles per day (2022 count), of which roughly 4% are trucks.
How long is ST 2 Main ST over Water Green River?
The structure is 129 ft (39.2 m) long with a longest span of 58 ft (17.6 m) and a deck 26 ft wide.
Who owns ST 2 Main ST over Water Green River?
It is owned by the State Highway Agency.