ST 8 Main ST over Water E Br Housatonic R
FairBerkshire County, Massachusetts · At Depot ST Intersection · Structure no. D010050BGDOTNBI
- Built
- 1902
- 123 years old, rebuilt 1954
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 89 ft
- 1 main span
- Daily traffic
- 5,850
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
ST 8 Main ST over Water E Br Housatonic R is a steel stringer/multi-beam or girder carrying ST 8 Main ST over Water E Br Housatonic R in Berkshire County, Massachusetts. It was built in 1902 and reconstructed in 1954, so it is 123 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,850 vehicles a day, roughly 10% of them trucks, projected to reach 6,001 by 2032. The structure is 89 ft (27.1 m) long and 54 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST 8 Main ST over Water E Br Housatonic R built?
It was built in 1902, making it 123 years old in 2025. It was reconstructed in 1954.
What condition is ST 8 Main ST over Water E Br Housatonic R in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does ST 8 Main ST over Water E Br Housatonic R carry?
About 5,850 vehicles per day (2017 count), of which roughly 10% are trucks.
How long is ST 8 Main ST over Water E Br Housatonic R?
The structure is 89 ft (27.1 m) long with a longest span of 85 ft (25.9 m) and a deck 54 ft wide.
Who owns ST 8 Main ST over Water E Br Housatonic R?
It is owned by the State Highway Agency.