HWY Spring ST over Water Hoosic River
FairPosted for loadBerkshire County, Massachusetts · .25 MI W of East RD · Structure no. A0401300HMUNNBI
- Built
- 1957
- 68 years old
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 48 ft
- 1 main span
- Daily traffic
- 1,293
- 2017 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
HWY Spring ST over Water Hoosic River is a steel stringer/multi-beam or girder carrying HWY Spring ST over Water Hoosic River in Berkshire County, Massachusetts. It was built in 1957, so it is 68 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 1,293 vehicles a day, roughly 6% of them trucks, projected to reach 3,159 by 2032. The structure is 48 ft (14.6 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY Spring ST over Water Hoosic River built?
It was built in 1957, making it 68 years old in 2025.
What condition is HWY Spring ST over Water Hoosic River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does HWY Spring ST over Water Hoosic River carry?
About 1,293 vehicles per day (2017 count), of which roughly 6% are trucks.
How long is HWY Spring ST over Water Hoosic River?
The structure is 48 ft (14.6 m) long with a longest span of 43 ft (13.2 m) and a deck 42 ft wide.
Who owns HWY Spring ST over Water Hoosic River?
It is owned by the Town or Township Highway Agency.