LA0969 over Boney Creek
PoorWest Feliciana Parish, Louisiana · 0 15 MI N of LA 66 · Structure no. 616308630100151
- Built
- 1983
- 42 years old
- Condition
- Poor
- inspected December 2024
- Type
- Slab
- Concrete
- Length
- 95 ft
- 5 main spans
- Daily traffic
- 385
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
LA0969 over Boney Creek is a concrete slab carrying LA0969 over Boney Creek in West Feliciana Parish, Louisiana. It was built in 1983, so it is 42 years old, younger than the Louisiana average of 43 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 385 vehicles a day, roughly 10% of them trucks, projected to reach 423 by 2041. The structure is 95 ft (29 m) long and 31 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was LA0969 over Boney Creek built?
It was built in 1983, making it 42 years old in 2025.
What condition is LA0969 over Boney Creek in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in December 2024.
How much traffic does LA0969 over Boney Creek carry?
About 385 vehicles per day (2021 count), of which roughly 10% are trucks.
How long is LA0969 over Boney Creek?
The structure is 95 ft (29 m) long with a longest span of 19 ft (5.8 m) and a deck 31 ft wide.
Who owns LA0969 over Boney Creek?
It is owned by the State Highway Agency.