US Bridges

Pickett RD over Coulee

Good

Vermilion Parish, Louisiana · 0.6 MI W of LA 339 · Structure no. 035729591920191

Built
1997
28 years old
Condition
Good
inspected September 2023
Type
Slab
Concrete
Length
57 ft
3 main spans
Daily traffic
500
2022 count
Owner
County
County Highway Agency

About this bridge

Pickett RD over Coulee is a concrete slab carrying Pickett RD over Coulee in Vermilion Parish, Louisiana. It was built in 1997, so it is 28 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 500 vehicles a day, projected to reach 550 by 2042. The structure is 57 ft (17.4 m) long and 27 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPickett RD
CrossesCoulee
Location0.6 MI W of LA 339
RouteCounty Highway 0
Coordinates29.98474, -92.03277
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.5 US tons
Inventory rating40.7 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length57 ft (17.4 m)
Longest span19 ft (5.8 m)
Deck width27 ft (8.2 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic500 (2022)
Projected traffic550 by 2042
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Pickett RD over Coulee built?

It was built in 1997, making it 28 years old in 2025.

What condition is Pickett RD over Coulee in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Pickett RD over Coulee carry?

About 500 vehicles per day (2022 count).

How long is Pickett RD over Coulee?

The structure is 57 ft (17.4 m) long with a longest span of 19 ft (5.8 m) and a deck 27 ft wide.

Who owns Pickett RD over Coulee?

It is owned by the County Highway Agency.