US Bridges

Ernest Faulk RD over Coulee

PoorPosted for load

Vermilion Parish, Louisiana · 0.6 MI S of LA 332 · Structure no. 035729585923381

Built
1999
26 years old
Condition
Poor
inspected July 2023
Type
Slab
Concrete
Length
38 ft
2 main spans
Daily traffic
90
2022 count
Owner
County
County Highway Agency

About this bridge

Ernest Faulk RD over Coulee is a concrete slab carrying Ernest Faulk RD over Coulee in Vermilion Parish, Louisiana. It was built in 1999, so it is 26 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.

It carries about 90 vehicles a day, projected to reach 99 by 2042. The structure is 38 ft (11.6 m) long and 22 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesErnest Faulk RD
CrossesCoulee
Location0.6 MI S of LA 332
RouteCounty Highway 0
Coordinates29.97539, -92.56435
Functional classRural Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck4 PoorAdvanced section loss, deterioration, spalling or scour.
Superstructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating15.3 US tons
Inventory rating11.8 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans2
Design loadHS 20
Structure length38 ft (11.6 m)
Longest span19 ft (5.8 m)
Deck width22 ft (6.7 m)
Roadway width20 ft (6.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic90 (2022)
Projected traffic99 by 2042
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Ernest Faulk RD over Coulee built?

It was built in 1999, making it 26 years old in 2025.

What condition is Ernest Faulk RD over Coulee in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in July 2023.

How much traffic does Ernest Faulk RD over Coulee carry?

About 90 vehicles per day (2022 count).

How long is Ernest Faulk RD over Coulee?

The structure is 38 ft (11.6 m) long with a longest span of 19 ft (5.8 m) and a deck 22 ft wide.

Who owns Ernest Faulk RD over Coulee?

It is owned by the County Highway Agency.