US Bridges

LA3127 over Saint James Canal

Good

St. James Parish, Louisiana · 7.4 M East of LA 70&3127 · Structure no. 614704280107351

Built
1989
36 years old
Condition
Good
inspected September 2024
Type
Slab
Concrete
Length
140 ft
7 main spans
Daily traffic
6,703
2021 count
Owner
State
State Highway Agency

About this bridge

LA3127 over Saint James Canal is a concrete slab carrying LA3127 over Saint James Canal in St. James Parish, Louisiana. It was built in 1989, so it is 36 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,703 vehicles a day, roughly 18% of them trucks, projected to reach 7,373 by 2041. The structure is 140 ft (42.7 m) long and 47 ft wide. If it were closed, the detour would be 29.8 mi (48 km).

CarriesLA3127
CrossesSaint James Canal
Location7.4 M East of LA 70&3127
RouteState Highway 3127
Coordinates29.99481, -90.88641
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans7
Design loadHS 20
Structure length140 ft (42.7 m)
Longest span20 ft (6.1 m)
Deck width47 ft (14.3 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,703 (2021)
Projected traffic7,373 by 2041
Trucks18%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed29.8 mi (48 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was LA3127 over Saint James Canal built?

It was built in 1989, making it 36 years old in 2025.

What condition is LA3127 over Saint James Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does LA3127 over Saint James Canal carry?

About 6,703 vehicles per day (2021 count), of which roughly 18% are trucks.

How long is LA3127 over Saint James Canal?

The structure is 140 ft (42.7 m) long with a longest span of 20 ft (6.1 m) and a deck 47 ft wide.

Who owns LA3127 over Saint James Canal?

It is owned by the State Highway Agency.