US Bridges

Sneed RD over Toro Creek

Good

Sabine Parish, Louisiana · 0.4 Ml NW of LA 118 · Structure no. 084300000084300

Built
2020
5 years old
Condition
Good
inspected February 2023
Type
Slab
Concrete
Length
60 ft
3 main spans
Daily traffic
125
2022 count
Owner
County
County Highway Agency

About this bridge

Sneed RD over Toro Creek is a concrete slab carrying Sneed RD over Toro Creek in Sabine Parish, Louisiana. It was built in 2020, so it is 5 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 125 vehicles a day, projected to reach 137 by 2042. The structure is 60 ft (18.3 m) long and 27 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesSneed RD
CrossesToro Creek
Location0.4 Ml NW of LA 118
RouteCounty Highway 0
Coordinates31.50007, -93.37255
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating62.5 US tons
Inventory rating48.2 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadGreater than HL 93
Structure length60 ft (18.3 m)
Longest span20 ft (6.1 m)
Deck width27 ft (8.1 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic125 (2022)
Projected traffic137 by 2042
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Sneed RD over Toro Creek built?

It was built in 2020, making it 5 years old in 2025.

What condition is Sneed RD over Toro Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does Sneed RD over Toro Creek carry?

About 125 vehicles per day (2022 count).

How long is Sneed RD over Toro Creek?

The structure is 60 ft (18.3 m) long with a longest span of 20 ft (6.1 m) and a deck 27 ft wide.

Who owns Sneed RD over Toro Creek?

It is owned by the County Highway Agency.