Minden RD over Ph RD 230 Stanley Cr.
PoorRed River Parish, Louisiana · 0.7 Mi. East of LA 5 · Structure no. 044132084931301
- Built
- 1975
- 50 years old
- Condition
- Poor
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 27 ft
- 2 main spans
- Daily traffic
- 72
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Minden RD over Ph RD 230 Stanley Cr. is a wood or timber stringer/multi-beam or girder carrying Minden RD over Ph RD 230 Stanley Cr. in Red River Parish, Louisiana. It was built in 1975, so it is 50 years old, older than the Louisiana average of 43 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 0 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: open, temporary structure in place while original is closed.
It carries about 72 vehicles a day, projected to reach 79 by 2040. The structure is 27 ft (8.2 m) long and 20 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 0 Failed | Out of service and beyond corrective action. |
| Superstructure | 0 Failed | Out of service and beyond corrective action. |
| Substructure | 0 Failed | Out of service and beyond corrective action. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Minden RD over Ph RD 230 Stanley Cr. built?
It was built in 1975, making it 50 years old in 2025.
What condition is Minden RD over Ph RD 230 Stanley Cr. in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in September 2024.
How much traffic does Minden RD over Ph RD 230 Stanley Cr. carry?
About 72 vehicles per day (2020 count).
How long is Minden RD over Ph RD 230 Stanley Cr.?
The structure is 27 ft (8.2 m) long with a longest span of 13 ft (4 m) and a deck 20 ft wide.
Who owns Minden RD over Ph RD 230 Stanley Cr.?
It is owned by the County Highway Agency.