US Bridges

Paul RD over Saline Bayou

Good

Rapides Parish, Louisiana · 2.5 Mi. East of LA 1206 · Structure no. 084000000080295

Built
2008
17 years old
Condition
Good
inspected September 2023
Type
Slab
Concrete
Length
140 ft
7 main spans
Daily traffic
350
2022 count
Owner
County
County Highway Agency

About this bridge

Paul RD over Saline Bayou is a concrete slab carrying Paul RD over Saline Bayou in Rapides Parish, Louisiana. It was built in 2008, so it is 17 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 350 vehicles a day, projected to reach 385 by 2042. The structure is 140 ft (42.7 m) long and 27 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesPaul RD
CrossesSaline Bayou
Location2.5 Mi. East of LA 1206
RouteCounty Highway 0
Coordinates31.38754, -92.1256
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating56.8 US tons
Inventory rating44 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans7
Design loadHS 20
Structure length140 ft (42.7 m)
Longest span20 ft (6.1 m)
Deck width27 ft (8.1 m)
Roadway width24 ft (7.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic350 (2022)
Projected traffic385 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Paul RD over Saline Bayou built?

It was built in 2008, making it 17 years old in 2025.

What condition is Paul RD over Saline Bayou in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Paul RD over Saline Bayou carry?

About 350 vehicles per day (2022 count).

How long is Paul RD over Saline Bayou?

The structure is 140 ft (42.7 m) long with a longest span of 20 ft (6.1 m) and a deck 27 ft wide.

Who owns Paul RD over Saline Bayou?

It is owned by the County Highway Agency.