Basco Lane over Calloway Ditch
PoorOuachita Parish, Louisiana · 1.62 MI E of US 165 S · Structure no. 053732172920371
- Built
- 2005
- 20 years old
- Condition
- Poor
- inspected March 2024
- Type
- Culvert
- Concrete
- Length
- 41 ft
- 4 main spans
- Daily traffic
- 75
- 2004 count
- Owner
- County
- County Highway Agency
About this bridge
Basco Lane over Calloway Ditch is a concrete culvert carrying Basco Lane over Calloway Ditch in Ouachita Parish, Louisiana. It was built in 2005, so it is 20 years old, younger than the Louisiana average of 43 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 75 vehicles a day, projected to reach 82 by 2024. The structure is 41 ft (12.5 m) long and 48 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Culvert | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Basco Lane over Calloway Ditch built?
It was built in 2005, making it 20 years old in 2025.
What condition is Basco Lane over Calloway Ditch in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in March 2024.
How much traffic does Basco Lane over Calloway Ditch carry?
About 75 vehicles per day (2004 count).
How long is Basco Lane over Calloway Ditch?
The structure is 41 ft (12.5 m) long with a longest span of 7 ft (2.1 m) and a deck 48 ft wide.
Who owns Basco Lane over Calloway Ditch?
It is owned by the County Highway Agency.