US Bridges

Eight Mile Lp over I-49

Good

Natchitoches Parish, Louisiana · 1.9 MI N of LA 6 · Structure no. 083504550631401

Built
1986
39 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
293 ft
2 main spans
Daily traffic
15,900
2016 count
Owner
State
State Highway Agency

About this bridge

Eight Mile Lp over I-49 is a prestressed concrete continuous stringer/multi-beam or girder carrying Eight Mile Lp over I-49 in Natchitoches Parish, Louisiana. It was built in 1986, so it is 39 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 15,900 vehicles a day, roughly 30% of them trucks, projected to reach 17,490 by 2036. The structure is 293 ft (89.3 m) long and 31 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesEight Mile Lp
CrossesI-49
Location1.9 MI N of LA 6
RouteCounty Highway 0
Coordinates31.75507, -93.1753
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating44 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2 (+2 approach)
Design loadHS 20
Structure length293 ft (89.3 m)
Longest span98 ft (29.9 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15,900 (2016)
Projected traffic17,490 by 2036
Trucks30%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Eight Mile Lp over I-49 built?

It was built in 1986, making it 39 years old in 2025.

What condition is Eight Mile Lp over I-49 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Eight Mile Lp over I-49 carry?

About 15,900 vehicles per day (2016 count), of which roughly 30% are trucks.

How long is Eight Mile Lp over I-49?

The structure is 293 ft (89.3 m) long with a longest span of 98 ft (29.9 m) and a deck 31 ft wide.

Who owns Eight Mile Lp over I-49?

It is owned by the State Highway Agency.