US Bridges

I0049 over Limekiln Bayou

Good

Natchitoches Parish, Louisiana · 1.2 Mi. S of JCT LA 6 · Structure no. 083504550628001

Built
1985
40 years old
Condition
Good
inspected June 2024
Type
Culvert
Concrete
Length
35 ft
3 main spans
Daily traffic
18,305
2021 count
Owner
State
State Highway Agency

About this bridge

I0049 over Limekiln Bayou is a concrete culvert carrying I0049 over Limekiln Bayou in Natchitoches Parish, Louisiana. It was built in 1985, so it is 40 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,305 vehicles a day, roughly 30% of them trucks, projected to reach 20,135 by 2041. The structure is 35 ft (10.7 m) long and 214 ft wide.

CarriesI0049
CrossesLimekiln Bayou
Location1.2 Mi. S of JCT LA 6
RouteInterstate 49
Coordinates31.71315, -93.14537
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment9: Superior to present desirable criteria
Operating rating44 US tons
Inventory rating34 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length35 ft (10.7 m)
Longest span11 ft (3.4 m)
Deck width214 ft (65.2 m)
Roadway width90 ft (27.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,305 (2021)
Projected traffic20,135 by 2041
Trucks30%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I0049 over Limekiln Bayou built?

It was built in 1985, making it 40 years old in 2025.

What condition is I0049 over Limekiln Bayou in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does I0049 over Limekiln Bayou carry?

About 18,305 vehicles per day (2021 count), of which roughly 30% are trucks.

How long is I0049 over Limekiln Bayou?

The structure is 35 ft (10.7 m) long with a longest span of 11 ft (3.4 m) and a deck 214 ft wide.

Who owns I0049 over Limekiln Bayou?

It is owned by the State Highway Agency.