US Bridges

E Bear Lake RD #2 over Bull Bayou

Good

Madison Parish, Louisiana · 5.8 MI W of US 65 · Structure no. 053332300911521

Built
1999
26 years old
Condition
Good
inspected April 2023
Type
Slab
Concrete
Length
95 ft
5 main spans
Daily traffic
144
1979 count
Owner
County
County Highway Agency

About this bridge

E Bear Lake RD #2 over Bull Bayou is a concrete slab carrying E Bear Lake RD #2 over Bull Bayou in Madison Parish, Louisiana. It was built in 1999, so it is 26 years old, younger than the Louisiana average of 43 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 144 vehicles a day, projected to reach 158 by 1999. The structure is 95 ft (29 m) long and 31 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesE Bear Lake RD #2
CrossesBull Bayou
Location5.8 MI W of US 65
RouteCounty Highway 0
Coordinates32.50085, -91.25599
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating27.9 US tons
Inventory rating21.8 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length95 ft (29 m)
Longest span19 ft (5.8 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic144 (1979)
Projected traffic158 by 1999
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was E Bear Lake RD #2 over Bull Bayou built?

It was built in 1999, making it 26 years old in 2025.

What condition is E Bear Lake RD #2 over Bull Bayou in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does E Bear Lake RD #2 over Bull Bayou carry?

About 144 vehicles per day (1979 count).

How long is E Bear Lake RD #2 over Bull Bayou?

The structure is 95 ft (29 m) long with a longest span of 19 ft (5.8 m) and a deck 31 ft wide.

Who owns E Bear Lake RD #2 over Bull Bayou?

It is owned by the County Highway Agency.