Atv Trail over Mack Bayou
FairPosted for loadMadison Parish, Louisiana · Mack Bayou (north) · Structure no. 000043690-00020
- Built
- 1986
- 39 years old
- Condition
- Fair
- inspected October 2023
- Type
- Girder and Floorbeam System
- Steel
- Length
- 54 ft
- 2 main spans
- Daily traffic
- 2
- 2023 count
- Owner
- Federal
- Bureau of Fish and Wildlife
About this bridge
Atv Trail over Mack Bayou is a steel girder and floorbeam system carrying Atv Trail over Mack Bayou in Madison Parish, Louisiana. It was built in 1986, so it is 39 years old, younger than the Louisiana average of 43 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 2 vehicles a day, projected to reach 5 by 2043. The structure is 54 ft (16.5 m) long and 10 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Atv Trail over Mack Bayou built?
It was built in 1986, making it 39 years old in 2025.
What condition is Atv Trail over Mack Bayou in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Atv Trail over Mack Bayou carry?
About 2 vehicles per day (2023 count).
How long is Atv Trail over Mack Bayou?
The structure is 54 ft (16.5 m) long with a longest span of 26 ft (7.9 m) and a deck 10 ft wide.
Who owns Atv Trail over Mack Bayou?
It is owned by the Bureau of Fish and Wildlife.